dynatopmodel-package |
Implementation of the Dynamic TOPMODEL hydrological model. |
aggregate_obs |
Resample observation data at a new time interval |
approx.pe.ts |
Create sinsuiodal time series of potential evapotranspiration input |
brompton |
Topographic and observation data for running Dynamic TOPMODEL. |
build_chans |
Construct a raster of channel locations from vector or topographic data |
build_layers |
Construct basic landscape layer data for Dynamic TOPMODEL run |
build_routing_table |
Generate a network routing table |
discretise |
Discrete a catchment into hydrological response units (HRUs) |
disp.par |
Default list of parameters to control the graphical output during model simulation and via disp.output |
disp_output |
Display output of a Dynamic TOPMODEL run |
dynatopmodel |
Implementation of the Dynamic TOPMODEL hydrological model. |
NSE |
Nash Sutcliffe Efficiency of a model's output against observations |
run.dtm |
Run Dynamic TOPMODEL using the catchment areal groupings (response units) for a discretisation. |
time_at_peak |
Time of maximum observation |
time_to_peak |
Time between the peak rainfall and the peak discharge |
upslope.area |
Upslope contributing area and wetness index calculation |